User Tools

Site Tools


public:naked-action-5-manual

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
public:naked-action-5-manual [2025/07/18 11:58] – [Tools needed] adminpublic:naked-action-5-manual [2025/08/14 14:45] (current) admin
Line 268: Line 268:
   * Make sure the orientation of the cable and pad is like shown on the picture.   * Make sure the orientation of the cable and pad is like shown on the picture.
 {{:public:action_5_disassemble_70_.jpg?nolink&800|}} {{:public:action_5_disassemble_70_.jpg?nolink&800|}}
-  * Use some UV mask to protect the cable and solderpads and cure with a UV flashlight.+  * Use some UV mask to protect the cable and solderpads and cure with a UV flashlight or use some other kind of glue.
 {{:public:action_5_disassemble_95_.jpg?nolink&800|}} {{:public:action_5_disassemble_95_.jpg?nolink&800|}}
   * The button and sensor ribbon cable should now look like this.   * The button and sensor ribbon cable should now look like this.
Line 316: Line 316:
 {{:public:action_5_disassemble_85_.jpg?nolink&800|}} {{:public:action_5_disassemble_85_.jpg?nolink&800|}}
   * Cut the ribbon PCB like shown in the picture   * Cut the ribbon PCB like shown in the picture
 +{{:public:action_5_assemble__35_.jpg?nolink&800|}}
 +  * Fold the ribbon PCB like shown in the picture, make sure to not bend the cable at too much of a angle.
 +{{:public:action_5_assemble__36_.jpg?nolink&800|}}
 +  * Secure the folded ribbon PCB with some capton tape and carefully cut off the excess tape.
  
- 
-TODO Cut Sensor off from Sensor Ribbon Cable 
  
  
Line 379: Line 381:
 {{:public:action_5_assemble_22_.jpg?nolink&800|}} {{:public:action_5_assemble_22_.jpg?nolink&800|}}
   * Plug in the front display ribbon cable to the mainboard. Ensure correct alignment before applying force.   * Plug in the front display ribbon cable to the mainboard. Ensure correct alignment before applying force.
-{{:public:action_5_assemble_23_.jpg?nolink&800|}} +{{:public:action_5_assemble__38_.jpg?nolink&800|}} 
-{{:public:action_5_assemble_24_.jpg?nolink&800|}} +{{:public:action_5_assemble__37_.jpg?nolink&800|}}
-  * ATTENTION: THE BACK DISPLAY CABLE IS CONNECTED THE WRONG WAY IN ALL FOLLOWING PICUTRES. MAKE SURE TO CONNECT IT THE RIGHT WAY (manual will be updated ASAP)+
   * Add the back display cable and tape it together to a compact package sitting ontop of the mainboard.   * Add the back display cable and tape it together to a compact package sitting ontop of the mainboard.
 {{:public:action_5_assemble_25_.jpg?nolink&800|}} {{:public:action_5_assemble_25_.jpg?nolink&800|}}
Line 387: Line 388:
   * Attach the cooling fan to the back case with M2*5 screws using an M2 hex tool.   * Attach the cooling fan to the back case with M2*5 screws using an M2 hex tool.
   * Make sure to get the fan direction right.   * Make sure to get the fan direction right.
-{{:public:action_5_assemble_27_.jpg?nolink&800|}} +{{:public:action_5_assemble__39_.jpg?nolink&800|}} 
-{{:public:action_5_assemble_28_.jpg?nolink&800|}} +{{:public:action_5_assemble__40_.jpg?nolink&800|}} 
-{{:public:action_5_assemble_29_.jpg?nolink&800|}} +{{:public:action_5_assemble__41_.jpg?nolink&800|}}
-{{:public:action_5_assemble_32_.jpg?nolink&800|}}+
   * Shorten the fan power cables.   * Shorten the fan power cables.
   * Shorten the mainboard power cables.   * Shorten the mainboard power cables.
Line 398: Line 398:
   * Solder both black cables to the GND pad.   * Solder both black cables to the GND pad.
   * Solder the white button cable to the PWR pad.   * Solder the white button cable to the PWR pad.
-{{:public:action_5_assemble_30_.jpg?nolink&800|}}+{{:public:action_5_assemble__42_.jpg?nolink&800|}}
   * Plug in the BEC ribbon cable to the mainboard. Ensure correct alignment before applying force.   * Plug in the BEC ribbon cable to the mainboard. Ensure correct alignment before applying force.
-{{:public:action_5_assemble_31_.jpg?nolink&800|}}+{{:public:action_5_assemble__44_.jpg?nolink&800|}}
   * Connect BEC ribbon cable to the BEC. Ensure correct alignment before applying force.   * Connect BEC ribbon cable to the BEC. Ensure correct alignment before applying force.
   * You will need to open the black bracket, slide in the ribbon cable and then close the bracket again.   * You will need to open the black bracket, slide in the ribbon cable and then close the bracket again.
public/naked-action-5-manual.1752839907.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki